Recent Changes - Search:

PmWiki

pmwiki.org

edit SideBar

BuildSchedule

Personel:

  • Sound can be set up by SW, plus one.
  • Lighting build will need LO, plus one?
  • Lighting focus will need LO, plus ???.
  • Everything else will be DHS, plus whoever is available for:
    • Contol.
    • Stage.
    • Power.
    • Backdrop.
    • Curtains.
    • Intercom.

Tasks:

  • Walk in Friday at ??:00 and expect to find:
    • Garage door should be closed.
    • Stage platforms and stairs should be set -- leave skirting available to be installed after all cables are in place.
    • Platform(s), stairs, and tables for control should be set.
    • Lights should be on.
    • Airwall should be ???
    • Room should be clear of debris. If chairs are stacked in room for later deployment, they should be in square formed by four pillars in back left corner.
    • There should be a water station set in elevator alcove.
    • Note to hotel: There will be no access to the storage room in the back of Franklin A during Saturday's afternoon & evening events. During the rest of the weekend, there will be limited access. Best to remove any gear that will likely be needed on Thursday.
  • Initial infrastructure, so that people can work on their specialties:
    • (time?) Expect delivery of rental gear.
      • Unpack and inventory gear first so that missing gear can be dealt with.
    • If the control tables are at the edge of their platforms, add gaff to give them a bit of resistance to shifting.
  • Power:
  • Intercom
  • Stage:
    • Bind stage with cargo straps.
    • Clamp on MC platform & wing(s).
    • Gaff stage joins.
  • Curtains:
    • Backdrop.
    • Run curtains from stage to green room access.
  • Hotel should set chairs.
  • Gaff cables in public areas.
  • Add skirting to stage.
Edit - History - Print - Recent Changes - Search
Page last modified on October 07, 2005, at 09:04 AM