Recent Changes - Search:

PmWiki

pmwiki.org

edit SideBar

BuildSchedule

Philcon2005.BuildSchedule History

Hide minor edits - Show changes to output

Changed lines 15-16 from:
** Stage platforms and chairs should be set by hotel -- leave skirting available to be installed after all cables are in place.
** Platform(s) and tables for control should be set by hotel.
to:
** Garage door should be closed.
** Stage platforms and stairs should be set -- leave skirting available to be installed after all cables are in
place.
** Platform(s), stairs, and tables for control should be set.
Deleted line 19:
** Garage door should be closed.
Changed line 31 from:
* ClearCom
to:
* Intercom
Changed line 14 from:
* Walk in at ??:00 and expect to find:
to:
* Walk in Friday at ??:00 and expect to find:
Added line 22:
** Note to hotel: There will be no access to the storage room in the back of Franklin A during Saturday's afternoon & evening events.  During the rest of the weekend, there will be limited access.  Best to remove any gear that will likely be needed on Thursday.
Changed lines 30-33 from:
** Stage:
*** Bind stage with cargo straps.
*** Clamp on MC platform & wing(s).
*** Gaff stage joins.
to:
* ClearCom

*
Stage:
** Bind stage with cargo straps.
** Clamp on MC platform & wing(s).
** Gaff stage joins.

* Curtains:
** Backdrop.
** Run curtains from stage to green room access
.
Changed lines 1-37 from:
Describe BuildSchedule here.
to:
Personel:
* Sound can be set up by SW, plus one.
* Lighting build will need LO, plus one?
* Lighting focus will need LO, plus ???.
* Everything else will be DHS, plus whoever is available for:
** Contol.
** Stage.
** Power.
** Backdrop.
** Curtains.
** Intercom.

Tasks:
* Walk in at ??:00 and expect to find:
** Stage platforms and chairs should be set by hotel -- leave skirting available to be installed after all cables are in place.
** Platform(s) and tables for control should be set by hotel.
** Lights should be on.
** Airwall should be ???
** Garage door should be closed.
** Room should be clear of debris.  If chairs are stacked in room for later deployment, they should be in square formed by four pillars in back left corner.
** There should be a water station set in elevator alcove.

* Initial infrastructure, so that people can work on their specialties:
** (time?) Expect delivery of rental gear.
*** Unpack and inventory gear first so that missing gear can be dealt with.
** If the control tables are at the edge of their platforms, add gaff to give them a bit of resistance to shifting.

* Power:

** Stage:
*** Bind stage with cargo straps.
*** Clamp on MC platform & wing(s).
*** Gaff stage joins.

* Hotel should set chairs.
* Gaff cables in public areas.
* Add skirting to stage.
Edit - History - Print - Recent Changes - Search
Page last modified on October 07, 2005, at 09:04 AM